San Joaquin Water Supply Pipeline

LOCATION:
Madera/Fresno Counties, CA

CLIENT:

Project Details

This project entailed the comprehensive demolition and replacement of the fish hatchery water supply line at the San Joaquin Fish Hatchery, situated at Friant Dam.

The scope of work encompassed a range of tasks including demolishing concrete and piping, fabricating custom pipe spools, installing excavation, backfilling 30″ water supply lines, and replacing concrete pipe support piers.

Furthermore, it involved the installation of a 200ft overhead water supply line, positioning valves and a backflow preventer, carrying out high-pressure grout injection for water basin repair, and conducting the demolition and replacement of electrical and controls for system control. Additionally, the project included the demolition and replacement of asphalt.

Image Gallery