Hydro Plant Spillway Kentucky

LOCATION:
Kentucky Dam

CLIENT:

Project Details

Total refurbishment was completed on 25 gates, weighing a combined total of 126 tons. This encompassed structural steel replacement, the removal of rivets, and their subsequent replacement with high-strength bolts. Additionally, 400 guide rollers, each weighing 500lbs, underwent thorough refurbishment.