Project Description
MCNARY 350-TON BRIDGE CRANE SKEW CORRECTION
Project Details
BCI was the prime contractor on this project and completed 55% of the work. This project consisted of work on two 350-Ton Bridge Cranes to correct skewing issues on both. The following was also included:
- Installation of new drive wheel assemblies
- Replacement of Idler wheel assemblies on one crane
- Replacement of Truck Equalizer Pin and bushings
- Installation of crane laser alignment system and anti-skewing system
- Structural repair and modifications to bridges
- Replacement of bridge drive VFD’s
- Load Testing of cranes
Specifications
CUSTOMER NAME
LOCATION
McNary Powerhouse, OR