Project Description

MCNARY 350-TON BRIDGE CRANE SKEW CORRECTION

Project Details

BCI was the prime contractor on this project and completed 55% of the work. This project consisted of work on two 350-Ton Bridge Cranes to correct skewing issues on both. The following was also included:

  • Installation of new drive wheel assemblies
  • Replacement of Idler wheel assemblies on one crane
  • Replacement of Truck Equalizer Pin and bushings
  • Installation of crane laser alignment system and anti-skewing system
  • Structural repair and modifications to bridges
  • Replacement of bridge drive VFD’s
  • Load Testing of cranes

Specifications

CUSTOMER NAME

LOCATION

McNary Powerhouse, OR