Beavers and Greers Ferry Dam

LOCATION:
Carroll and Cleburne Counties, Arkansas

CLIENT:

Project Details

Electrical renovation of spillway structure at both Beaver and Greers Ferry involved the replacement of power feed conductors and spillway switchboard, as well as the installation of a new stand-by generator. Additionally, the project included the replacement of Tainter gate and head gate control cabinets, along with the implementation of a new Tainter gate positioning system at Beaver Dam. To address the damage caused by flooding, a bulkhead control system was reverse engineered and replaced.

Image Gallery