Greers Ferry Maintenance Bulkhead Closure System

LOCATION:
Heber Springs, Arkansas

CLIENT:

Project Details

Installation of Bulkhead closure system. We successfully installed nine (9) 20-ton hoists and work platforms on the dam using a specialized floating temporary work scaffold, expertly designed by BCI. Additionally, we skillfully fabricated a massive 33-ton floating Bulkhead, boasting impressive dimensions of 48 feet wide and 28 feet tall.

Image Gallery