Greers Ferry Maintenance Bulkhead Closure System
LOCATION:
Heber Springs, Arkansas
CLIENT:
Project Details
Installation of Bulkhead closure system. We successfully installed nine (9) 20-ton hoists and work platforms on the dam using a specialized floating temporary work scaffold, expertly designed by BCI. Additionally, we skillfully fabricated a massive 33-ton floating Bulkhead, boasting impressive dimensions of 48 feet wide and 28 feet tall.