Chesterfield Valley Pump Station
LOCATION:
Chesterfield, Missouri
CLIENT:



Project Details
This project involved excavation for the pump station foundation, widening the existing entrance channel, establishing an exit channel, and preparing the subbase for the required revetment. A dewatering system was necessary for the pump station excavation, along with measures for controlling surface water and protecting against floods during construction. The construction of pump stations and experience in earthwork were also essential aspects of this project.