Hydro Plant Spillway Kentucky LOCATION:Kentucky Dam CLIENT: Project Details Total refurbishment was completed on 25 gates, weighing a combined total of 126 tons. This encompassed structural steel replacement, the removal of rivets, and their subsequent replacement...
Belleville Lock Dam LOCATION:Reedsville, Ohio CLIENT: Project Details Belleville Lock & Dam was a three-phase project. The first phase involved sandblasting and metalizing 10 350-ton tainter gates, with a floating plant used for equipment. In the second phase,...
Arch Mineral Raw Coal Circuit / Crusher Retrofit LOCATION:Percy, Illinios CLIENT: Project Details Installed a brand new crusher, enhanced material handling, and upgraded conveyors specifically designed for the coal operation. Revamped the 200-ton coal bin to ensure...
Refurbish J4 Test Cell LOCATION:Arnold AFB, Tennessee CLIENT: Project Details 18 truss sections were successfully removed and replaced in a 100’ diameter x 205’ deep underground rocket test cell. Our team designed and fabricated the necessary truss sections, while...
Dardenelle Power Plant LOCATION:Dardanelle, Arkansas CLIENT: Project Details With our expertise, we disassembled, repaired, and replaced roller chains and assembly gates for head gates, providing top-notch solutions tailored to specific needs. Our skilled team applied...