Mahoning Creek Crane Rehab

Mahoning Creek Crane Rehab LOCATION:New Bethlehem, Pennsylvania CLIENT: Project Details The scope of this contract encompassed the restoration of the two 64-Ton gantry cranes at Mahoning Creek Dam. The comprehensive rehabilitation work included the complete overhaul...

Bateman Pump Station – Texas

Bateman Pump Station – Texas LOCATION:Truscott, Texas CLIENT: Project Details Replaced three 250hp 1200V vertical turbine pump motors with more efficient 480V motors. Upgraded cross-line motor starters with advanced 250 VFD’s. Provided a complete supply and...

Bull Shoals

Bull Shoals LOCATION:Bull Shoals Dam, Arkansas CLIENT: Project Details Removed the previous chains on the Tainter gates and replaced them with a newly designed, fabricated, and installed wire rope system. Other Projects Chesterfield Valley Pump Station Learn More...

Pickwick Wheeler Lock Control Rehab

Pickwick Wheeler Lock Control Rehab LOCATION:Tennessee River CLIENT: Project Details Rehabilitation of lock controls for Pickwick and Wheeler dams was undertaken to enhance their operation and functionality. Image Gallery Other Projects Madera Canal Headworks Low Flow...

Wood River Drainage and Levee Dist Closure Structure

Wood River Drainage and Levee Dist Closure Structure LOCATION:Wood River Drainage and Levee Dist. CLIENT: Project Details Refurbished 15 flood gates and closure structures, completely replaced 2 flood gates and permanently closed three flood gate closures. Conducted...