AH Bankhead
LOCATION:
Northport, Alabama
CLIENT:


Project Details
This project encompassed fabricating and installing new headgates, draft tube stop logs, and a handrail at the lower stop log slots. Additionally, new trash rack guide rails were fabricated and installed, and the existing trash rack was successfully removed and reinstalled. Finally, the existing powerhouse door was widened or alternative methods were provided to facilitate the movement of the runner into the powerhouse.