Project Description

TRINITY DAM

Project Details

  • Removal of calcium carbonate (Calcite) buildup from walls of the valve Bonnet Chamber, gate shaft, and both slots for Fixed Wheel Gate.
  • Perform a Proof-by-Demonstration that the gate slots accommodate future removal of the Gate.
  • Survey walls and pressure grout the cracks identified on the cleaned wall and slot surfaces.
  • Refurbish joints of the 24-inch pipe and the 20-inch pipe; furnish and install restraint supports.
  • Design, furnish, install and test an Electro-Osmotic Pulse (EOP) System for Calcite mitigation system in the Gate Shaft.

Specifications

CUSTOMER NAME

LOCATION

Trinity Dam near Lewiston, California

Project Gallery