Project Description

SLUCIE GATE TERMINUS PINE FLAT DAM

Project Details

   BCI Construction was the prime contractor on this project.  This project is on Pine Flat Dam and Terrminus Dam. Project constisted of Blasting, repair and painted of 26 sluice gates and 13 gate conduits.

Highlights

  •  All work on Pine Flat Dam was completed on 2 different gallery levels, one level was 230’ below top of dam and the other level was 400’ below top of dam
  • Mobilize equipment to gallerys through shaft in the dam
  • All work was performed in a confinded space access through 1 18” manhole
  • Abrashive blasting gates and conduit floor, walls and ceiling
  • Repair gate sealing surface and repair pits in gates and conduit walls
  • Application of cold-tar epoxy paint system

Specifications

CUSTOMER NAME

LOCATION

Fresno, CA

Project Gallery