Project Description
SAN JOAQUIN WATER SUPPLY PIPELINE
Project Details
This project consisted of the demolition and replacement of the fish hatchery water supply line at for the San Joaquin Fish Hatchery at Friant Dam.
Highlights
- Concrete Demolition
- Piping Demolition
- Fabrication of custom pipe spools
- Excavation installation and backfill of 30” water supply lines
- Demolition and replacement of 24”x42”x10ft tall concrete pipe support piers.
- Installation of 200ft of 30” overhead water supply line
- Installation of valves and backflow preventer.
- High Pressure Grout injection for repair of water basin.
- Demo and replacement of electrical and controls for system control.
- Asphalt demolition and replacement.
Specifications
CUSTOMER NAME
LOCATION
Friant Dam, Madera/Fresno Counties, CA