Project Description

Grand Coulee Bride Crane Replacement

Project Details

BCI is the prime contractor for this project and is teaming up with subcontractors Engineered Material Handling and G&G Steel to replace the 4 exisitng overhead bridge cranes located in the right and left powerhouses.  BCI will be removing, installing and testing the cranes located in Grand Coulee, Washington.  Two 175 Ton bridge cranes in each powerhouse will work together in tandem to handle the combined unit rotor and lifting beam load of 700 tons.

Specifications

CUSTOMER NAME

LOCATION

Grand Coulee Dam, Washington

Project Gallery