Project Description
FOSTER BRIDGE CRANE REHABILITATION AND RE-RATING
Project Details
- Up-rating the 50-ton bridge crane to 60-ton
- Structural modifications to the existing bridge
- Replacement of cab, controls, lights, control wiring, and power wiring
- Replacement of bridge drive motor, gearbox, and brake
- Replacement of Crane Buss Bar
- Removal of end trucks and refurbishment of end trucks
- Inspection and service of remaining components and systems
- Recertification to the 60-ton rating via acceptance and load testing
On this project, BCI was able to provide the Government with a new trolley instead of refurbishing the existing trolley (as contract called for) via a VECP with a $65k savings to the Government.
Specifications
CUSTOMER NAME
LOCATION
Foster Powerhouse, OR