Project Description
CHESTERFIELD VALLEY PUMP STATION
Project Details
Work requires excavation for the pump station foundation, for widening the existing entrance channel, for establishing an exit channel, and as subbase preparation for required revetment. A dewatering system for the pump station excavation may be required. Unwatering of excavations, surface water control, and flood protection measures will be required during construction. Construction of Pump Stations and Experience of Earth Work is required.
Specifications
CUSTOMER NAME
LOCATION
Chesterfield, MO