Cape Girardeau Floodwall

LOCATION:
Cape Girardeau, Missouri

CLIENT:

Project Details

With a meticulous approach, we installed new expansion joints, concrete encasements with water stop, and replaced sections of the floodwall, ensuring its resilience against potential threats. Our expertise shines through the construction of a 300′ long, 60′ deep sheet pile cut-off wall, along with the replacement of the toe drain. Working closely with the Corp of Engineers, we prioritized safety by monitoring river levels before initiating any floodwall work.

Image Gallery