Project Description
BELLEVILLE LOCK & DAM
Project Details
Belleville Lock & Dam was a three-phase project
- Phase 1: Sand Blast and Metalize 10 350 ton tainter gates utilizing a floating plant for equipment
- Phase 2: Blast & Paint five 160 ton emergency Bulkheads and Lead contaminated Picking Beam
- Phase 3: Blast & Paint Bridge Crane. BCI designed Negative Air Containment, which could handle 100 MPH storm conditions.
- Project was completed ahead of schedule